During the installation of a new pipeline, thrust blocks—critical structural elements designed to resist pipeline forces—began to sink. The issue was traced to poorly compacted subsoils beneath the blocks, compounded by significant groundwater infiltration.
As the blocks shifted, they no longer provided the intended resistance, putting the pipeline’s long-term performance and integrity at risk. Conventional repair methods, such as excavation and replacement, would have been costly, time-consuming, and disruptive to the surrounding environment. The client required a solution that would restore stability quickly, minimize downtime, and ensure the pipeline’s structural reliability.
Geotechnical polyurethane injection was selected as the optimal remediation approach. Our specialized team drilled small-diameter injection points around and beneath the thrust blocks, targeting the weak, water-affected soils. High-performance polyurethane was then injected into these zones, where it expanded to displace groundwater, fill voids, and compact surrounding soils. The lightweight yet durable material provided immediate lifting power to re-level the thrust blocks, while simultaneously creating a stable, water-resistant foundation. Unlike cementitious grouts, the polyurethane maintained strength without adding significant weight, reducing the risk of further settlement. The process was completed with minimal disruption no large-scale excavation or removal of thrust blocks was necessary, allowing the pipeline installation to remain on schedule.
The thrust blocks were successfully lifted and stabilized, restoring them to their design elevations and ensuring proper resistance against pipeline forces. By eliminating groundwater pathways and reinforcing the subgrade, long-term durability and performance were secured.
For the client, the benefits were clear: