Conventional repair methods—such as excavation and re-compaction—would have required significant disturbance, heavy equipment mobilization, extended downtime, and potential disruption to adjacent infrastructure and operations.
The client required a solution that could restore support quickly, safely, and with minimal impact to ongoing facility operations.
Geotechnical polyurethane was selected to backfill the washed-out zones and construct engineered “pipeline support pillows” beneath the 75″ penstock.
Using strategically placed injection points, high-density polyurethane was injected beneath the pipeline. The expanding material flowed into voided areas, displacing water, filling irregular cavities, and bonding with surrounding soils. As the material expanded and cured, it formed structural support designed to re-establish uniform bearing beneath the pipeline.
Key advantages of the approach included:
The work was completed efficiently, with limited site disturbance and no need for heavy civil reconstruction.
The polyurethane backfill and support pillow system successfully restored structural bearing beneath the penstock pipeline. Voids caused by washout were fully filled, and the pipeline was re-supported with uniform, engineered bearing capacity.
For the client, this meant:
By utilizing geotechnical polyurethane, the project delivered a durable, long-term stabilization solution while maintaining operational continuity. The minimally invasive nature of the process ensured that infrastructure integrity was restored without the disruption typically associated with large-diameter pipeline repairs.