A municipal maintenance hole was experiencing active groundwater infiltration and ingression through joints, pipe penetrations, and hairline cracks in the concrete structure.
A residential driveway in British Columbia had experienced significant differential settlement, creating uneven surfaces, trip hazards, and poor drainage around the home.
Following a period of extreme weather and significant rainfall, erosion and washout occurred beneath a 75-inch diameter penstock pipeline.
An office building in Alberta was experiencing significant settlement in one of its interior floor slabs.
Severe voiding left one bridge approach slab unsupported, while erosion threatened the other. The owner needed a fast, cost-effective repair that restored stability and kept traffic moving.
Groundwater seepage along the downstream face and concrete joints of an upgraded Alberta water reservoir dam required a precise, non invasive repair that could permanently stop leaks without excavation, reconstruction, or environmental disruption.
Voids caused by drainage issues, erosion, and settlement threatened the stability of an Alberta MSE wall and adjacent concrete slabs, requiring a fast, non invasive repair that could restore support for heavy traffic without excavation or downtime.